The Project as of September 7, 1999

Brush on the property where the horses are supposed to be
The valley fogged in in the morning from the home site
The valley fogged in in the morning from the home site
The valley fogged in in the morning from the home site
The valley fogged in in the morning from the home site
The home site still in need of some clearing
The tractor in the brush (the horse area to be) ready to start some clearing the septic work
Cimmer on the uncleared homesite
Where the driveway is supposed to be
The fire trail below where the house will be
The main pad cleared and the gravel for the septic system delivered
One of the septic tanks in place
One of the septic tanks in place
Both septic tanks in place after a lot of digging
Both septic tanks in place after a lot of digging - two 12x12x12 holes had be dug for the placement
Both septic tanks in place after a lot of digging - two 12x12x12 holes had be dug for the placement
Both septic tanks in place after a lot of digging - two 12x12x12 holes had be dug for the placement

Back to main house page