The Project as of September 7, 1999
|
| Brush on the property where the horses are supposed to be |
|
| The valley fogged in in the morning from the home site |
|
| The valley fogged in in the morning from the home site |
|
| The valley fogged in in the morning from the home site |
|
| The valley fogged in in the morning from the home site |
|
| The home site still in need of some clearing |
|
| The tractor in the brush (the horse area to be) ready to start some clearing the septic work |
|
| Cimmer on the uncleared homesite |
|
| Where the driveway is supposed to be |
|
| The fire trail below where the house will be |
|
| The main pad cleared and the gravel for the septic system delivered |
|
| One of the septic tanks in place |
|
| One of the septic tanks in place |
|
| Both septic tanks in place after a lot of digging |
|
| Both septic tanks in place after a lot of digging - two 12x12x12 holes had be dug for the placement |
|
| Both septic tanks in place after a lot of digging - two 12x12x12 holes had be dug for the placement |
|
| Both septic tanks in place after a lot of digging - two 12x12x12 holes had be dug for the placement |