The Project as of September 24, 2000 - part 2
|
| Filling the trench with gravel |
|
| Filling the trench with gravel |
|
| Pipes for the drain |
|
| Fredrico putting in drainage pipes |
|
| Trenching on the other side of the house too |
|
| Trenching on the other side of the house too |
|
| Damaged sealer cans |
|
| Fredrico installing drain pipe |
|
| Interior painters in the kitchen covering things up |
|
| Interior painters in the living room covering things up |
|
| The upstairs dining loft with the new iron railing installed |
|
| The upstairs dining loft with the new iron railing installed |
|
| Interior painter Chris Romero (CPR) painting the batcave |
|
| Interior painter Chris Romero (CPR) painting the batcave |
|
| Cliff and me in the Bobcat |
|
| Ben in the Bobcat |
|
| Ben in the Bobcat working at moving the 10 tons of graval into the drainage field |
|
| Ben in the Bobcat working at moving the 10 tons of graval into the drainage field |
|
| Ben in the Bobcat working at moving the 10 tons of graval into the drainage field |
|
| Ben in the Bobcat working at moving the 10 tons of graval into the drainage field |
|
| Ben in the Bobcat working at moving the 10 tons of graval into the drainage field |