The Project as of September 20, 2000
|
| With the final grading things are starting to get messy again - here is the barn with stuff in front of it |
|
| The house with windows covered for sealing |
|
| The house with windows covered for sealing |
|
| The new truck in parked in the newly expanded horse arena |
|
| The old truck with the wood stove in the back |
|
| The newly expanded horse ring |
|
| Grading in the front of the house |
|
| We moved the trailer and dirt in everywhere |
|
| The laundry room with tile and sink (Kohler cast iron) in place |
|
| The full bath tile finished |
|
| The full bath shower tile finished |
|
| The half bath tile finished |
|
| The master bath tile and glass block finished |
|
| The master bath tile and glass block finished |
|
| The painting/sealing begins |
|
| The mess |
|
| Hymie (the tile guy who did an incredible job) and Ben |
|
| Cowboy Cliff doing some grading measurements |
|
| Cowboy Cliff doing some grading measurements |
|
| Hymie the tile master |
|
| Art F. on an old bull dozer |
|
| We changed the driveway again to make it more curved (view of the house from the street) |
|
| The horse ring finished |
|
| The tailer being moved by the bull dozer |