The Project as of September 16, 1999
|
| One of the two septic tanks (8'x8'x8') dug in place |
|
| The septic alarm system |
|
| The septic pump in place in the lower septic tank |
|
| The septic tank covered with dirt (and the shadow of the piture taker) |
|
| The water system in place awaiting water - 5000 gallon poly tank and three 180 gallon presure tanks |
|
| The water system in place awaiting water - 5000 gallon poly tank and three 180 gallon presure tanks |
|
| The water pressure pump and power setup |
|
| The water pressure pump and power setup |
|
| The water pressure output |
|
| The water system in place awaiting water - 5000 gallon poly tank and three 180 gallon presure tanks |
|
| The top septic field trenched and ready for plumbing |