The Project as of September 12, 1999
|
| The freshly graveled newly cut driveway |
|
| The 5000 gallon poly water tank arrives |
|
| Cimmer standing where the front door is suposed to be |
|
| Septic tank in place |
|
| The upper septic field in progress |
|
| Looking (west) down the driveway at the morning fog - the scrub to the left will go to make room for the horses |
|
| The house site |
|
| Part of the upper septic field |
|
| The septic tanks and a line leading to the upper septic field |
|
| The septic tanks and a line leading to the upper septic field |
|
| The upper septic field |
|
| The upper septic field almost done |
|
| The upper septic field almost done |
|
| The upper septic field almost done |
|
| The septic tanks in place |
|
| The water system in place and ready for setup |
|
| The fire hydrant outlet in place and the pressure pump in the wrong place |
|
| The water system in place and ready for setup |
|
| The water system in place and ready for setup |
|
| The water system in place and ready for setup |