The Project as of September 12, 1999

The freshly graveled newly cut driveway
The 5000 gallon poly water tank arrives
Cimmer standing where the front door is suposed to be
Septic tank in place
The upper septic field in progress
Looking (west) down the driveway at the morning fog - the scrub to the left will go to make room for the horses
The house site
Part of the upper septic field
The septic tanks and a line leading to the upper septic field
The septic tanks and a line leading to the upper septic field
The upper septic field
The upper septic field almost done
The upper septic field almost done
The upper septic field almost done
The septic tanks in place
The water system in place and ready for setup
The fire hydrant outlet in place and the pressure pump in the wrong place
The water system in place and ready for setup
The water system in place and ready for setup
The water system in place and ready for setup