The Project as of August 7, 2000
|
| Typical summer sunrise |
|
| Typical summer sunrise |
|
| Typical summer sunrise |
|
| Front of the house ready for the roof |
|
| Cabinets in place in the laundry room |
|
| The laundry room and hall cabinets (oak and maple) |
|
| Full bath bath tub in place |
|
| Hallway with cabinets wallboard and floated floor |
|
| The kitchen cabinets starting to get installed |
|
| The kitchen cabinets starting to get installed |
|
| The master bath |
|
| The master bath |
|
| The master bedroom |
|
| The kitchen area - natural hickory cabinets |
|
| Natural hickory cabinets |
|
| Mater bath cabinets |
|
| The kitchen starting to take shape |