The Project as of August 1, 2000
|
| Skylights in place in the batcave |
|
| The batcave with wallboard in place |
|
| The batcave with wallboard in place |
|
| The batcave from the loft entrance |
|
| The dining room area with wallboard in place |
|
| The front hall with wallboard in place |
|
| The hallway with wallboard in place |
|
| The kitchen with wallboard in place (before the floor was floated) |
|
| Wall board finished and the cement for the tile floor starts (2.5 inches) |
|
| The master bedroom and storage area for junk |
|
| The master bath ready for floating (pouring of cement layer) |
|
| Cement in place where the kitchen is supposed to be |
|
| Cement in the living room area |
|
| The new Ford F250 Super Duty truck |