The Project as of August 1, 2000

Skylights in place in the batcave
The batcave with wallboard in place
The batcave with wallboard in place
The batcave from the loft entrance
The dining room area with wallboard in place
The front hall with wallboard in place
The hallway with wallboard in place
The kitchen with wallboard in place (before the floor was floated)
Wall board finished and the cement for the tile floor starts (2.5 inches)
The master bedroom and storage area for junk
The master bath ready for floating (pouring of cement layer)
Cement in place where the kitchen is supposed to be
Cement in the living room area
The new Ford F250 Super Duty truck

Back to main house page