The Project as of April 7, 2000
|
| The room structure is starting to take shape |
|
| The room structure is starting to take shape |
|
| The room structure is starting to take shape |
|
| Looking up from the living room |
|
| Sunny in the morning at the house and cloudy throughout the valley |
|
| Looking up at the ceiling above the loft area |
|
| Roof structure from the left side of the house |
|
| Morning fog below |
|
| The main roof beams in the loft area |
|
| Heating vents in the floor are starting to be installed |
|
| Kate |
|
| Kate |
|
| Kate and Patrick |