The Project as of April 30, 2000
|
| The view from the front of the house as the knoty pine is being installed on the roof |
|
| The roof from the inside looking about the master bathroom and bedroom |
|
| The living room beams and the view of the valley |
|
| The upstairs "batcave" (i.e. Ben's office) with most of the roof in place |
|
| The batcave view out the side windows and the dormer toward the valley |
|
| Looking across the upstairs toward the loft area and the master bedoom on the other side of the house |
|
| From the batcave looking toward the living room |
|
| Looking directly out of the batcave dormer windows |
|
| The main living room beam |
|
| The living room view |
|
| Looking out of the loft are toward the new barn and the horse area |
|
| The horse area with Kate running around from the loft |
|
| Looking down at the living room from the loft |
|
| From the loft looking toward the master bedroom |
|
| The beams above the loft from the loft |
|
| Cimmer working Kate from the horse area with the house in the background |
|
| Cimmer on Kate |
|
| Cimmer on Kate |
|
| Ben and Kate in front of the new barn |
|
| The new barn |