The Project as of April 3, 2000

The main roof beams are now in place thanks to the giant crane that was brought in
The left side of the house and the roof beam in place
The right side of the house and the roof beam in place
The 92 foot beam running the width of the house over the master bedroom
The 92 foot beam running the width of the house over the kitchen going to the side with the two bedrooms
The master bedroom view looking out the place for the sliding glass doors
The main roof beam in the living room - 23 feet in the air