The Project as of April 3, 2000
|
| The main roof beams are now in place thanks to the giant crane that was brought in |
|
| The left side of the house and the roof beam in place |
|
| The right side of the house and the roof beam in place |
|
| The 92 foot beam running the width of the house over the master bedroom |
|
| The 92 foot beam running the width of the house over the kitchen going to the side with the two bedrooms |
|
| The master bedroom view looking out the place for the sliding glass doors |
|
| The main roof beam in the living room - 23 feet in the air |