The Project as of March 11, 2000
|
| The upstairs area over the bedrooms (the Batcave) almost ready for a floor and the roof support beam propped up |
|
| The loft area and the front of the house |
|
| Main living room support post in place - it is pretty high in the air |
|
| Cimmer in the master bedroom closet |
|
| The master bedroom looking into the living room |
|
| Brackets and the kitchen area |
|
| Deer where the horses are supposed to be |