The Project as of March 11, 2000

The upstairs area over the bedrooms (the Batcave) almost ready for a floor and the roof support beam propped up
The loft area and the front of the house
Main living room support post in place - it is pretty high in the air
Cimmer in the master bedroom closet
The master bedroom looking into the living room
Brackets and the kitchen area
Deer where the horses are supposed to be

Back to main house page