The Project as of January 28, 2000
|
| The floor with one level of logs in place while the framing of some of the doors and window starts to take place |
|
| The floor with one level of logs in place while the framing of some of the doors and window starts to take place |
|
| The log installation finally begins with one level of logs and the framing of some of the doors and windows |
|
| Logs ready to go |
|
| Logs ready to go |
|
| The front of the house through the front door area |
|
| Gunner looking through the front door |
|
| The office trailer, the office phone both and an International Harvester truck |
|
| The crew |
|
| Cimmer jogging on the fire/horse trail below the house |